Figure: 16 TAC §3.101(f)(3)(B)(ii)
If the average depth to the top of the formation (in feet) |
||
exceeds- |
but does not exceed- |
The maximum allowable production rate (in thousand cubic feet per day) may not exceed- |
0 |
1,000 |
44 |
1,000 |
1,500 |
51 |
1,500 |
2,000 |
59 |
2,000 |
2,500 |
68 |
2,500 |
3,000 |
79 |
3,000 |
3,500 |
91 |
3,500 |
4,000 |
105 |
4,000 |
4,500 |
122 |
4,500 |
5,000 |
141 |
5,000 |
5,500 |
163 |
5,500 |
6,000 |
188 |
6,000 |
6,500 |
217 |
6,500 |
7,000 |
251 |
7,000 |
7,500 |
290 |
7,500 |
8,000 |
336 |
8,000 |
8,500 |
388 |
8,500 |
9,000 |
449 |
9,000 |
9,500 |
519 |
9,500 |
10,000 |
600 |
10,000 |
10,500 |
693 |
10,500 |
11,000 |
802 |
11,000 |
11,500 |
927 |
11,500 |
12,000 |
1,071 |
12,000 |
12,500 |
1,238 |
12,500 |
13,000 |
1,432 |
13,000 |
13,500 |
1,655 |
13,500 |
14,000 |
1,913 |
14,000 |
14,500 |
2,212 |
14,500 |
2,557 |